Encino Residence

Concept study

The hill and the code first. Then the plans. Then the pictures.

Most concept houses start as a picture. This one started with a slope, the Los Angeles hillside rules, and two old oaks.

Before any image was made, we set an imagined lot in the Encino hills, south of Ventura Boulevard: 160 by 260 ft, a street on the ridge to the east, the ground falling about 78 ft to a canyon in the west. The zone is RE15, in the City's hillside area. On a hillside the cap on floor area follows the slope: the lot is split into bands by steepness, and each band allows less the steeper it gets, from 35 percent of its area on gentle ground down to 15 percent on the steepest. On this lot the bands add up to 11,360 sq ft. Side yards of 20 ft on each side earn a 20 percent bonus, so the cap is 13,632. The house counts 13,490.

The City counts more than rooms. A porch under a solid roof counts, so the covered outdoor room, 448 sq ft, is in the total. A lower floor does not count when no more than 60 percent of its outside walls stand more than 3 ft out of the ground. Our Lower level is dug into the hill and open to the view on one face only, 34.6 percent of its walls, so its 3,784 sq ft are not counted. In all the house encloses 17,026 sq ft on three levels.

Height decided the shape. With flat roofs the limit is 30 ft, and on a hillside it is measured from the ground under each point, not from the street. A house that stacks its floors on a slope runs out of height at once. So this one steps down: the Street level at the top, the Garden level 12 ft below, the Lower level 12 ft below that. Its highest point is 29 ft 11 in over the slope, at a chimney. Near the street the rule is 24 ft over the street; ours stands 12 ft. From the street it is one low story behind a concrete wall, and the drama is on the side facing the view.

The oaks came before the plan. Coast live oaks and western sycamores are protected in Los Angeles. We placed an old live oak in the front yard, a second beside the pool terrace and a sycamore in the canyon, and fitted the house round them. The drive bends round the first oak, the terrace stops at the second one's drip line, and nothing is built under a crown.

The ground carries the rest. The Garden and Lower levels and the pool terrace stand on 56 drilled caissons and grade beams, drawn schematic, since a real design belongs to the soils and structural engineers. Earth moved under the house is not counted against the grading cap; the pool, the terraces and the drive are. The stricter of the City's two published caps allows 1,600 cubic yards here, and this study counts 112. Hauling on a hillside runs only from 9 a.m. to 3 p.m. on weekdays, and the schedule on this page allows for it.

The City says most hillside land in this part of the Valley is in a Very High Fire Hazard Severity Zone, and we drew the house as if its lot is too. The look is concrete, fir and glass: board-formed concrete walls, deep flat roofs, and glass between them. The glass is tempered in both panes. The roofs have no vents. The fir at the roof edges and soffits is fire retardant treated, and the terraces are concrete and stone.

From the plan data we built one model of the whole lot and the hill under it. Every view in the gallery was set up inside that model first, then finished as a rendering. We also drew what the pictures leave out: the lighting, the furniture with its clearances, and the services room by room.

Then we checked. A script runs 1,734 checks on the plan data every time it changes: the area against the cap, every roof edge and chimney against the 30 ft limit over the slope, the Lower level against the 60 percent rule, every room's clear size, every door and window on its wall, and the distance to every tree. The model runs more than 13,000 of its own. When the model found a fault in the plan data, the data was fixed and everything rebuilt.

We went this far for a house nobody ordered because this is the part of building that clients and architects rarely see from a contractor: the reading, the coordinating and the checking that happen before a crew shows up on a hillside. Akopi Builders has been building in Los Angeles since 2014. We would start a real hillside house the same way.

The images on this page are renderings of a concept design, not photographs of a built home.